11/3/2023 0 Comments Ashrae 90.1 continuous insulation![]() ![]() ![]() ![]() Where special conditions exist, the code official is authorized to require necessary construction documents to be prepared by a registered design professional. The construction documents shall be prepared by a registered design professional where required by the statutes of the jurisdiction in which the project is to be constructed. In the IECC, Section C103.1 Construction Documents, General, the wording states that construction documentation and other supporting data shall be submitted in one or more sets with each application for a permit. The commercial energy code requires that a registered professional submit compliance documentation (construction documents and compliance verification).
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |